  A. New Evidence
2. The Rabe-Bemis Diving Expedition in August 2000
 
2.3.5 The port front bulkhead - Page 3
 
Pointer 1
The opening for the visor actuator in the forecastle deck.
The two images below from 02.10.94 – the first official ROV inspection – show the centre part of this opening with the remains of the punched through deck beam at frame 159.
0096
enlarge
 
0097
enlarge
These two images show the same area as found by the divers in August 2000, i.e. basically unchanged.