|
|
A. New Evidence |
2. The Rabe-Bemis Diving Expedition in August 2000 |
|
2.3.5 The port front bulkhead - Page 3 |
|
|
Pointer 1
The opening for the visor actuator in the forecastle deck. The two images below from 02.10.94 – the first official ROV inspection – show the centre part of this opening with the remains of the punched through deck beam at frame 159. |
|
|
|
These two images show the same area as found by the divers in August 2000, i.e. basically unchanged. |
|
|
|
|
|
|
|
|