  A. New Evidence
2. The Rabe-Bemis Diving Expedition in August 2000
 
2.3.5 The port front bulkhead - Page 6
 
Pointer 4
Opening in the recess for the ramp hook.
The two images below show the opening in the recess through which the mating lug for the ramp hook was sticking when the ramp was in closed position. The right image was made by divers, the left one by ROV, both in August 2000. Both images show a heavy indentation apparently resulting from a heavy impact not too long before the videos were made.
0103
0104

This impact damage is a further indication that the bow ramp had been opened and later had been closed again.

 