Topbanner
blue line
line
line
line
line
  A. New Evidence

 

 
3.4 Cause Considerations Concerning the Damage Inside the Ramp House of the Visor - Page 3
 
The photo below shows the forward bulkhead of the ramp house to be completely unaffected.
0157

The next photo shows the aft bulkhead with paint cracked off and indentations outside/inside in way of the bent hp profiles, which is a clear indication that there has been load acting on this side of the ramp house.
This load could either have been created as explained by the drawing on the previous page and/or during the attempts to move the visor to some other location as explained in the previous chapter.

0158
0159
 
arrow left sitemap arrow right